Installing the ash crucible, O_3696, H_3697 – BUCHI DuMaster D-480 User Manual

Page 191: H_3508, E 191)

Advertising
background image

Operation Manual D-480

©BÜCH Labortechnik AG

8 - Maintaining the instrument

191

 Place the ash crucible in the tube rack into the vent or else on a heat-resistant surface until it has

completely cooled down.

 Protect the hot ash crucible from unauthorized access.

 If there are any corundum balls sticking on the bottom of the ash crucible, top up some balls in

the combustion tube.

Installing the ash crucible

Note

The following section is a continuation of Removing the ash crucible (on page 188). All steps
described there must already have been performed.

Process

The section is divided into the following phases:

Installing the ash crucible

Follow-up instrument preparation: Gas pressure / gas-tightness

Safety instruction

Strictly observe the safety instruction "Replacing the ash crucible/finger" under Warning notes
during operation
(on page 24).

Requirements

The instrument must be in "Replace part" status. See instructions "Preparing the instrument, Gas
pressure" in Preparing and following up maintenance work (on page 171).

Keep a tube extractor ready.

Keep a filled ash finger ready. See Filling the combustion tube (on page 222).

Top view furnace

The following picture shows a top view of the furnace pulled out:

Legend:

1 Post combustion tube plug
2 Post combustion tube
3 Combustion tube connection
4 Combustion tube
5 Reduction tube plug
6 Reduction tube

Phase 1: Installing the ash crucible

Proceed as follows:

Advertising