BUCHI DuMaster D-480 User Manual

Page 192

Advertising
background image

Operation Manual D-480

©BÜCH Labortechnik AG

8 - Maintaining the instrument

192

 Insert the new ash crucible into the combustion tube (4).

 Place the combustion tube connection (3) onto the combustion tube (4). The lance must extend

into the ash crucible approx. 5 - 10 mm.

 Place the ungreased seal on the combustion tube connection (3) at the top.

Furnace area

The following picture shows the details of the furnace area:

Legend:

1 Handle
2 Bayonet catch
3 Reduction tube connection
4 Post combustion tube connection

Phase 1: Installing the ash crucible (continued)

Proceed as follows:

 Push the furnace back:

Lift the bayonet catch (2) slightly so as not to damage the seal on the combustion tube
connection.

Close the bayonet catch by turning the bayonet catch handle (1) to the left.

 Close the ground-in clamp (3) on the reduction tube.

 Connect the post combustion tube with the two ground-in clamps again.

 Connect the O

2

supply tube with a ground-in clamp.

 Close the front door.

Phase 2: Follow-up work, gas pressure/ tightness

After completing all maintenance work, put the instrument back into a state ready for measurement.
See "Follow-up preparation of the instrument: Gas pressure / tightness" in Preparing and following
up maintenance work
(on page 171).

To be observed after maintenance

If you have performed maintenance work that has a defined maintenance interval, you must manually
reset the "Status" field to zero on the "Maintenance intervals" dialog (accessible via Options >
Maintenance > Intervals
. See Defining maintenance intervals in the software (on page 170).

Advertising