BUCHI DuMaster D-480 User Manual

Page 204

Advertising
background image

Operation Manual D-480

©BÜCH Labortechnik AG

8 - Maintaining the instrument

204

Furnace area

The following picture shows the details of the furnace area:

Legend:

1 Handle
2 Bayonet catch
3 Reduction tube connection
4 Post combustion tube connection

Phase 4: Bringing the instrument to a "ready to measure" state

Proceed as follows:

 Close the right side door (magnetic lock).

 Replace the carousel.

 Push the furnace back:

Lift the bayonet catch (2) slightly so as not to damage the seal on the combustion tube
connection.

Close the bayonet catch by turning the bayonet catch handle (1) to the left.

 Close the ground-in clamp (3) on the reduction tube.

 Push the heat cover onto the angle plates above the quartz glass bridge.

 Close the front door.

 Set the normal temperatures as the setpoint temperature of the furnaces. To do so, open the

"Instrument parameters" dialog in the operating software by selecting Options > Settings >
Parameters
.

 Wait for the tubes to reach the correct temperature.

 Once the furnaces are stable, perform a leak test. See Performing a leak test (on page 242).

 The instrument is only ready to measure when the leak test is successful.

To be observed after maintenance

If you have performed maintenance work that has a defined maintenance interval, you must manually
reset the "Status" field to zero on the "Maintenance intervals" dialog (accessible via Options >
Maintenance > Intervals
. See Defining maintenance intervals in the software (on page 170).

Advertising