H_1947, O_3720 – BUCHI DuMaster D-480 User Manual

Page 202

Advertising
background image

Operation Manual D-480

©BÜCH Labortechnik AG

8 - Maintaining the instrument

202

Process

The section is divided into the following phases:

Cleaning the half shells and ball

Assembling the ball valve

Mounting the ball balve

Preparing the Instrument for measurements

Requirements

Before starting work, the following requirements must be met:

Keep the following tools ready:

Hook wrench

Phillips screwdriver / Allen wrench 3 mm

8 mm open jaw wrench.

Keep acetone ready to clean components.

The ball valve must have been removed.

The instrument must have cooled down and be disconnected from the mains when you install the
ball valve again. See step 1 in Removing and dismantling the ball valve (on page 197).

Safety instruction

Strictly observe the safety instruction "Hot instrument parts" under Warning notes during operation
(on page 24).

Dismantled ball valve

The following picture shows the disassembled ball valve:

Legend:

1 Wheel flange of the half shells
2 Top and bottom half shell
3 Ball
4 Screws
5 Drive bearing
6 Holder plate
7 O-ring
8 Bayonet catch

Phase 1: Cleaning the half shells and ball

Proceed as follows:

 Clean the half shells (2) and the ball (3) with acetone.

 Check the half shells (2) for grooves. If there are any grooves, replace the half shells.

 Check the ball (3) for grooves. If there are any grooves, replace the ball.

Advertising