Unpacking the iad, Iad package components, Installing the iad – Verilink Net Engine (3150-30626-001) Product Manual User Manual

Page 29: Ac power and uninterruptible power supply, Clearance requirements

Advertising
background image

NetEngine IAD User Guide

Quick Start Guide

10

Unpacking
the IAD

Each IAD is packed and shipped in a durable container. If you haven’t
already done so, open the container and unpack the IAD. Carefully
remove the IAD from the package and packing material.

IAD Package Components

Each IAD is shipped with the components listed below. As you unpack
them, note their condition and identity, and compare the list to the packing
list in the package.

u

AC power adapter and cord (6 feet long), or AC power cord

u

Agency Compliance information sheet

u

Ethernet cable (straight through), 7 feet long

u

WAN cable (varies by interface), 7 feet long

If you note any visible damage, or components are missing, notify the
shipping company immediately to make a damage claim. Contact the
company from which the IAD was purchased (Verilink, or an authorized
distributor) to obtain a Return Material Authorization (RMA) for return of
damaged equipment, or to order missing components.

Installing
the IAD

After you unpack the IAD, find a suitable location to install the IAD in the
customer’s premises. Ideal locations include computer equipment room, or
a telephone or wiring closet. You can locate the IAD in an equipment rack,
on a table or shelf, or it may be wall-mounted. Install the IAD in a location
that is generally protected and the IAD will be undisturbed.

AC Power and Uninterruptible Power Supply

The IAD requires access to AC power (NEMA 15-3R). Make sure the IAD
is located within six feet of an AC power outlet. Locate the nearest power
outlet and plug in the supplied AC power adapter or AC power cord. If
there is an uninterruptible power supply on premises, plug the AC power
adapter or cord into that power source.

Ensure that the power cord conveniently and safely reaches the rear panel
of the IAD where the power plug or adapter jack is located.

Clearance Requirements

If you install the IAD horizontally, make sure you maintain at least 2 inches
of horizontal distance from other IADs or other electronic equipment, to
ensure adequate ventilation and heat dissipation. If you install the IAD

NOTE

We suggest you keep the shipping container and packing
material for future shipping or storage of the unit.

LAN LINK

LAN ACT

WAN LINK

VOICE

POWER

6000 Family

Do not attach the AC power adapter, or power up the unit at
this time.

LAN LINK

LAN ACT

WAN LINK

VOICE

POWER

7000 Family

Plug in the power cord, but do not power up the unit

Advertising