Melsec-q, Point – MITSUBISHI ELECTRIC QJ71C24N User Manual

Page 31

Advertising
background image

1 - 6 1 - 6

MELSEC-Q

1 OVERVIEW

(7) Connecting the GX Developer and the GOT

(a) Connecting the GX Developer (Details are explained in the GX Developer

Operating Manual.)

• By connecting a PC installed with a GX Developer to the interface of the Q

series C24 at the same time, operations such as programming, monitoring

and testing for the PLC CPU can be performed.

• By connecting multiple PCs installed with GX Developers to the PLC CPU

or Q-series C24 at the same time, operations such as programming and

monitoring can be performed simultaneously by multiple operators.

Operating the GX Developers using these simultaneous connections can

improve program performance.

• Operations can be performed from a GX Developer by setting the

communication protocol of the Q series C24 interface to which a PC is

connected to "0" with the switch setting using the GX Developer.

(b) Connecting the GOT (Details are explained in the GOT User's Manual

(Connection).)

• By connecting a GOT (graphic operation terminal) to the interface for the

Q series C24 operations such as monitoring the PLC CPU can be

performed.

• Operations such as monitoring the PLC CPU can be performed by setting

the communication protocol of the Q series C24 interface to which a GOT

is connected to "0" with the switch setting using a GX Developer.

(c) Simultaneous connection of GX Developer and GOT

• It is possible to connect a PC with GX Developer and the GOT to two

interfaces of the Q series C24 at the same time. It is thus possible for more

than one user to perform programming, monitoring, etc. simultaneously.

• When the GOT and the PC with GX Developer are connected at the same

time, the two interfaces of the Q series C24 cannot perform an interlock

operation.

QJ71C24-R2

CH1.

CH2.

CH1.

CH2.

Q25HCPU

MODE

RUN

ERR.

USER

BAT.

BOOT

RS-232

USB

RS-232 cable

GX Developer

GOT

or

GOT

or

GX Developer

POINT

When GX Developer and/or the GOT is connected directly to the Q series C24,

switching settings using GX Developer need not be made to perform access to the

QCPU, monitoring and other operations. (They can also be performed when the

communication protocol is set to "0" by making switch settings using GX

Developer.)

Advertising
This manual is related to the following products: