ADLINK ND-6067 User Manual

Page 35

Advertising
background image

33

2.2.7 Installation

Software Utility

Software is not necessary.

Equipments for Installation

A 2-wire RS-485 network or 4-wire RS-422 network.

DC Power supply (+10V~+30V)

Wires

Installation Procedure

1. Make sure the original RS-422/RS-485 network is power off.

2. Wire the power supply to ND-6510. Note that the power supply should meet

the specification.

3. Wire other NuDAMs to the extend RS-485 bus

Advertising
This manual is related to the following products: