Display board service operations, Output voltage testing – Labconco PURICARE Procedure Station Models 34812xx User Manual
Page 145
Advertising
![background image](/manuals/738628/145/background.png)
Page 145 of 197
Output Voltage Testing
NOTE: Use caution when measuring test voltages to avoid short
circuits.
There are 4 test points to measure the output of the Power and Relay boards,
numbered TP1-TP4, as shown in Figure 9-6.
Figure 9-6
Test Point 3 (TP3)
Test Point 1 (TP1)
Test Point 2 (TP2)
Test Point 4 (TP4)
\
Under normal operation, the following voltages should be read:
TP1 – Ground
TP2 - +12 +/- 0.48 VDC
TP3 - +5 +/- 0.20 VDC
TP4 - + 21-24 VDC
Display Board Service Operations
Display Board Diagnostics is addressed in the section on Touchpad Test Operations.
Advertising
This manual is related to the following products: