Completing the system, Analysis, Completing the system -9 – Altera JNEye User Manual
Page 186: Analysis -9
![background image](/files/763732/content/doc186.png)
Completing the System
All the link components are now chosen and placed in the Link Designer. Click Connect in the Link
Designer to begin connecting the components. Refer to the Link and Simulation Setting section for link
construction in the Link Designer. The following figure shows the completed link system.
Figure 4-8: Complete VSR 28 Gbps Link Connection in Link Designer
The link configuration is complete. Use the Save/Save as buttons to save the configuration for later use.
Analysis
Use the Channel Viewer to observe and analyze the channel characteristics. The Channel Viewer button
is located on the right side of the Channel tab. This example shows the S
dd21
of the five channels you
selected as well as the channel responses at test points and the overall channel. You can leave the Channel
Viewer module open or close it by clicking OK or Exit.
UG-1146
2015.05.04
Completing the System
4-9
Tutorial: 28 Gbps OIF VSR Link with Arria 10 GT
Altera Corporation