Completing the system, Analysis, Completing the system -9 – Altera JNEye User Manual

Page 186: Analysis -9

Advertising
background image

Completing the System

All the link components are now chosen and placed in the Link Designer. Click Connect in the Link

Designer to begin connecting the components. Refer to the Link and Simulation Setting section for link

construction in the Link Designer. The following figure shows the completed link system.

Figure 4-8: Complete VSR 28 Gbps Link Connection in Link Designer

The link configuration is complete. Use the Save/Save as buttons to save the configuration for later use.

Analysis

Use the Channel Viewer to observe and analyze the channel characteristics. The Channel Viewer button

is located on the right side of the Channel tab. This example shows the S

dd21

of the five channels you

selected as well as the channel responses at test points and the overall channel. You can leave the Channel

Viewer module open or close it by clicking OK or Exit.

UG-1146

2015.05.04

Completing the System

4-9

Tutorial: 28 Gbps OIF VSR Link with Arria 10 GT

Altera Corporation

Send Feedback

Advertising