2 checking the communications status, 2 checking the communications status -8, 1) operation procedure – Yaskawa Sigma-5 User Manual: MECHATROLINK-II Commands User Manual

Page 25

Advertising
background image

2 Operation Sequence

2.1.2 Checking the Communications Status

2-8

2.1.2 Checking the Communications Status

Turn ON the control and main circuit power supplies and use the following procedure to confirm that the SER-

VOPACK is ready for communications.

(1) Operation Procedure

„

When the

Σ-V Series SERVOPACKs (SGDV-†††A11, -†††A15, -†††D11,

-†††D15, -†††F11, -†††F15) or the Large-Capacity

Σ-V Series SERVOPACKs

(SGDV-†††H11, -†††J11) are Used

„

When the DC Power Input

Σ-V Series SERVOPACKs (SGDV-†††E11) are Used

Procedure

Operation

1

Confirm that the wiring is correctly made.

2

Turn ON the SERVOPACK control and main circuit power supplies.
When the control power is being normally supplied to the SERVOPACK, POWER LED on the SERVO-
PACK is lit.
When the main circuit power supply is ON, CHARGE is lit.

3

Turn ON the controller power supply and start MECHATROLINK communications.

4

Check the communications status.
When communications in the data link layer have started, COM LED on the SERVOPACK is lit.
Note: If COM LED is not lit, check the communications settings of SW1, SW2, and the controller, and then

turn the power supplies OFF and ON again.

When the MECHATROLINK-II connection in the application layer is established, the 7-segment LED indi-
cates the completion of CONNECT execution as shown below.

Procedure

Operation

1

Confirm that the wiring is correctly made.

2

Turn ON the SERVOPACK control and main circuit power supplies.

3

Turn ON the controller power supply and start MECHATROLINK communications.

4

Check the communications status.
When communications in the data link layer have started, COM LED on the SERVOPACK is lit.
Note: If COM LED is not lit, check the communications settings of SW1, SW2, and the controller, and then

turn the power supplies OFF and ON again.

When lit: CONNECT execution completed

When unlit: CONNECT execution not completed

When lit: During data link communications.
When unlit: Communications not established.

Advertising