The following example sets sequence #2 to do a zero-span calibration every other day starting at 1:00
AM on September 4, 2011, lasting 15 minutes, without calibration. This will start ½ hour later each
iteration.

Table 9-4: Example AutoCal Sequence

MODE AND

ATTRIBUTE

VALUE COMMENT

SEQUENCE

2

Define Sequence #2

MODE

ZERO-SPAN

Select Zero and

Span Mode

TIMER ENABLE

ON

Enable the timer

STARTING DATE

Sept. 4, 2011

Start after

Sept 4, 2011

STARTING TIME

1:00 AM

First Span starts at

1:00AM

DELTA DAYS

2

Do Sequence #2

every other day

DELTA TIME

00:30

Do Sequence #2 ½

hr later each day

DURATION

15.0

Operate Span valve

for 15 min

CALIBRATE

OFF

Calibrate at end of

Sequence

I

MPORTANT

I

MPACT ON

R

EADINGS OR

D

ATA

The programmed STARTING_TIME must be a minimum of 5 minutes
later than the real time clock for setting real time clock (See Section
5.6).

Avoid setting two or more sequences at the same time of the day.

Any new sequence that is initiated whether from a timer, the COMM
ports or the contact closure inputs will override any sequence that is
in progress.

The CALIBRATE attribute must always be set to OFF on analyzers with
IZS Options installed and functioning.

Calibrations should ONLY be performed using external sources of
Zero Air and Span Gas whose accuracy is traceable to EPA standards.