Teledyne 9110T - Nitrogen Oxides Analyzer User Manual

Page 313

Advertising
background image

Model 9110T NOx Analyzer

Troubleshooting & Service

Teledyne Analytical Instruments

313

Figure 12-9:

9110T Sensor Assembly

6. Remove the two connectors on the PMT housing end plate facing towards the front

panel.

7. Remove the end plate itself (4 screws with plastic washers).

Note

If the black PMT housing end plate for the Sensor Assembly is removed,
ensure to replace the 5 desiccant bags inside the housing.

8. Remove the dryer packages inside the PMT housing.

9. Unscrew the PMT assembly, which is held to the cold block by two plastic screws.

10. Discard the plastic screws and replace with new screws at the end of this procedure

(the threads get stripped easily and it is recommended to use new screws).

11. Along with the plate, slide out the OPTIC TEST LED and the thermistor that

measures the PMT temperature.

 Thermistor will be coated with a white, thermal conducting paste.

 Do not contaminate the inside of the housing with this grease, as it may

contaminate the PMT glass tube on re-assembly.

12. Carefully take out the assembly consisting of the HVPS, the gasket and the PMT.

Advertising