Teledyne 9110T - Nitrogen Oxides Analyzer User Manual

Page 253

Advertising
background image

Model 9110T NOx Analyzer

Instrument Maintenance

Teledyne Analytical Instruments

253

Figure 11-5:

NO

2

Converter Assembly

10. Wrap the band heater around the new replacement converter cartridge and tighten

the screws using a high-temperature anti-seize agent (TAI P/N CH42) such as
copper paste.

 Ensure to use proper alignment of the heater with respect to the converter

tubes.

11. Replace the Moly converter assembly by routing the cables through the holes in the

converter housing and reconnecting them properly.

12. Reconnect the steel cable clamp around the power leads for safe operation.

13. Reattach the tube fittings to the converter and replace the Moly insulation (top layer

and corner cut out layers).

14. Reinstall the converter assembly cover.

Advertising