Stress testing a cec device, Setting up the cec controller – Quantum Data 881 User Manual

Page 387

Advertising
background image

881/882 Video Test Generator User Guide (Rev A.22)

369

3. Enter the following command to query the log for a message with a specific opcode and

to only return specific parameter values.

CEC1:MSGX? 83 D

//queries log for message with specified opcode

and request return of destination address

4. Enter the following command to query the value of a specific byte number of

parameters a message with a user specified opcode:

CEC1:MSGX? 83 P 2

//returns value of 2nd byte of the parameters of

a message with opcode 83

5. Enter the following command to query whether one message with a user specified

opcode occurs before or after another.

CEC1:MSGX? 83 O 84 //returns order of message with opcodes specified

The response will be one of:

0 - opcode 2 occurred before opcode 1
1 - opcode 1 occurred before opcode 2
2 - opcode 1 or opcode 2 not found
3 - opcode 1 and opcode 2 not found
255 - opcode 1 is the same as opcode 2

To clear the CEC message log:

1. Enter the following command to clear the messages in the log.

CEC1:MSGC

//clears the message log

You can also clear the message log with the following command:

CECU

Stress testing a CEC device

The CEC ITE provides both a command driven interface and a graphical Java-based
application (CEC Controller) for stress testing CEC devices under test. The features in the
ITE command line or CEC Controller can be used to verify certain compliance related
tests under various adverse conditions such as boundry testing of timing, arbitration,
corrupt bit timing, and acknowledgement.

Setting up the CEC Controller

You access the CEC Controller through the generator’s web home page.

Advertising
This manual is related to the following products:

882