Quantum Data 881 User Manual

Page 493

Advertising
background image

881/882 Video Test Generator User Guide

(Rev A.22)

475

DPRX:LLCT? 4 3

// Runs the link layer compliance test 4:(4.2.2.3)

EDID Read

” three times.

To run the Link Layer compliance test on DisplayPort sinks (receiver) through the
GUI:

1. Connect a cable between the DisplayPort Rx connector on the 882E and the device’s

DisplayPort transmitter interface with the DisplayPort function.

The following diagram depicts the test setup:

2. Setup the 882 for DisplayPort testing. Refer to

Setting up the 882 for DisplayPort

testing:

” on page 454.

'LVSOD\3RUW/LQN/D\HU

'LVSOD\3RUW/LQN/D\HU

6RXUFH

7UDQVPLWWHU

'87

6LQN

(

'LVSOD\3RUW5[

Advertising
This manual is related to the following products:

882