Setting up the tests – Quantum Data 881 User Manual

Page 472

Advertising
background image

454

Chapter 14 DisplayPort Link Layer Testing

Setting up the tests

Prior to running the link layer compliance tests you will need to setup the generator and
the equipment under test for DisplayPort testing. After the test has been setup you can
begin testing.

Use the procedures below to setup the generator for link layer compliance testing of sink
devices.

Setting up the 882 for DisplayPort testing:

1. Activate the DisplayPort interface by pressing the

Interface key and choosing the

DisplayPort interface as shown below.

Alternatively, to activate the interface through the command line interface, enter the
following commands:

12

5.3.1.3

Successful Link Training to a Lower Link Rate
Due To Clock Recovery Lock Failure During
Clock Recovery Sequence

13

5.3.1.4

Successful Link Training with Request of a
Change to Pre-Emphasis And/Or
Voltage Swing Setting During Channel Equal-
ization Sequence

14

5.3.1.5

Successful Link Training at Lower Link Rate
Due to Loss of Symbol Lock During Channel
Equalization Sequence

15

5.3.1.6

Lane Count Reduction

16

5.3.1.7

Lane Count Increase

17

5.3.2.1

IRQ_HPD Pulse Due to Loss of Symbol Lock
and Clock Recovery Lock

18

5.3.2.2

IRQ HPD Pulse Due to Loss of Inter-lane Align-
ment Lock

19

5.4.1.1

Pixel data reconstruction

20

5.4.1.2

Main Stream Data Unpacking and Unstuffing –
Least Packed TU

21

5.4.1.3

Main Stream Data Unpacking and Unstuffing –
Most Packed TU

22

5.4.2.

Main Video Stream Format Change Handling

Index

Test

Description

DispPort*

Advertising
This manual is related to the following products:

882