Quantum Data 881 User Manual

Page 476

Advertising
background image

458

Chapter 14 DisplayPort Link Layer Testing

5. Select

Link Test to access the Link Layer compliance test menu.

The following is displayed on the generator’s LCD.

6. Select

!SinkRpt by pressing the adjacent soft key to run the Sink Link Layer

compliance test and generate a report.

Alternatively, you can run the link layer compliance test through the command line
interface by entering the following command:

DPTX:LLCT? 3 4

// Runs the link layer compliance test 3:(5.2.1.4)

“Write nine bytes to valid DPCD address” four
times.

To run the Link Layer compliance test on DisplayPort sinks (receiver) through the
GUI:

1. Connect a cable between the DisplayPort Tx connector on the generator and the

device’s DisplayPort receiver interface with the DisplayPort function.

The following diagram depicts the test setup:

2. Setup the 882 for DisplayPort testing. Refer to

Setting up the 882 for DisplayPort

testing:

” on page 454.

!SinkRpt

!SrcRpt

'LVSOD\3RUW/LQN/D\HU

6RXUFH

(

6LQN 5HFHLYHU

'87

'LVSOD\3RUW7[

Advertising
This manual is related to the following products:

882