Running hdcp compliance tests on hdmi receivers – Quantum Data 881 User Manual

Page 630

Advertising
background image

612

Chapter 18 Testing HDCP

Note: The SRM test does not apply for source devices that cannot play a DVD.

3. To run 1A-08 test, use the command line as shown below:

CPTX:DUTT 1

// Selects the device type as a source.

CPTX:CPTR 8

// Selects specific test (e.g. 1A_08).

CPTX:CPTU

// Initiates the execution of the test.

Refer to

To view the HDCP compliance report:

” on page 651 for procedures on how to

view the generated report.

Running HDCP compliance tests on HDMI receivers

The receiver tests are the 2C-0x series. The test procedures differ somewhat for the 882E
analyzer and the 882CA.

For the 882E the 2C-01 and 2C-04 tests are run multiple times for various settings. The
2C-01 test is required to be run in two configurations: 1) combined reads and 2) short
reads. The 2C-04 test is required to be run in six (6) configurations. There are two read
configurations: 1) short read and 2) combined read and there are three encryption pulse
configurations: 1) in the beginning of the vertical blanking; 2) in the middle of the vertical
blanking and 3) at the end of the vertical blanking.

With 882E releases prior to 2.17.x, these multiple iterations for the 2C-01 and 2C-04 test
have to run through the command line. For the 2.17.x release, these multiple iterations are
handled in the batch mode but you can choose to run them through the command line as
well.

For the 882CA (with release 2.13.3) only the 2C-01 test is run multiple times for the two
configurations: 1) combined reads and 2) short reads. These tests must be run through
the command line.

Refer to

To run the 2C-01 HDCP compliance test on an HDMI sink (receiver):

” on page

618 for procedures on running this test. Refer to

To run the 2C-04 HDCP compliance test

on an HDMI sink (receiver):

” on page 619 for procedures on running this test.

Advertising
This manual is related to the following products:

882