11 defining the cycle time of the plc project, Defining the cycle time of the plc project – Lenze EtherCAT Controller-based Automation User Manual

Page 160

Advertising
background image

11

Defining the cycle time of the PLC project

11.1

Determining the task utilisation of the application

160

Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

11

Defining the cycle time of the PLC project

This chapter provides information on how to ...

• die

Determining the task utilisation of the application

( 160)

;

• das

Optimising the system

( 162)

.

11.1

Determining the task utilisation of the application

In the online mode, the Monitor tab of the Task Configuration shows current status details and

measurements of the cycles, cycle times, and jitters of the tasks contained.

The values are updated in the same time interval as that used for monitoring the values from the

controller.
If the cursor is on a task name field, the values displayed can be reset to 0 by the Reset context menu

command (right-click the task name field).

Advertising