2 installing field devices, 3 create a project folder, Installing field devices – Lenze EtherCAT Controller-based Automation User Manual

Page 43: Installing field devices ( 43), Create a project folder ( 43), 7commissioning of the system

Advertising
background image

Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17

43

7

Commissioning of the system

7.3

Detailed description of the commissioning steps

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

7.3.2

Installing field devices

For the installation of a field device, follow the mounting instructions for the respective device.

7.3.3

Create a project folder

Create a project folder on the Engineering PC.
Use this project folder to store the data generated in the following different project configuration

steps:

• Project data created in the »Engineer« or »EASY Starter«
• Project data created in »PLC Designer«

Tip!
Create a separate project folder for every EtherCAT configuration and store the project files.

Note!

• In the case of all field devices, the EtherCAT interfaces must be wired in accordance

with the preceding topology planning. Make sure that the inputs (IN) and outputs

(OUT) are not mixed up with each other; otherwise, the topology changes.

Communication

( 19)

• The physical sequence of the field devices in the EtherCAT network must match the

EtherCAT configuration created in »PLC Designer«.

• The master automatically assigns the node addresses to the slaves. Therefore, a

manual address assignment is not required.

Advertising