7commissioning of the system – Lenze EtherCAT Controller-based Automation User Manual

Page 90

Advertising
background image

7

Commissioning of the system

7.3

Detailed description of the commissioning steps

90

Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. Open the EtherCAT I/O image tab and select the bus cycle task for the master (in so far as

this has not yet happened in the task configuration).

The "Cycle settings of the higher-level bus" serve to use the bus cycle task set via the PLC

settings tab of the Lenze Controller (device):

Advertising