7commissioning of the system – Lenze EtherCAT Controller-based Automation User Manual
Page 90
Advertising
![background image](/manuals/565689/90/background.png)
7
Commissioning of the system
7.3
Detailed description of the commissioning steps
90
Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. Open the EtherCAT I/O image tab and select the bus cycle task for the master (in so far as
this has not yet happened in the task configuration).
The "Cycle settings of the higher-level bus" serve to use the bus cycle task set via the PLC
settings tab of the Lenze Controller (device):
Advertising