B. Upload the parameters currently set in a Servo-Inverter i700 to the Engineering PC and store

them there:

• Select a Servo-Inverter i700 in the device list
• With the

button or the <F7> function key, upload the parameter set of the servo inverter.

(The parameter set of the servo inverter is transferred directly to »EASY Starter« without the

parameter set being stored on the controller.)

• With the Save button, store the parameter as a GDC file on the Engineering PC.