4the lenze automation system with ethercat – Lenze EtherCAT Controller-based Automation User Manual

Page 31

Advertising
background image

Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17

31

4

The Lenze automation system with EtherCAT

4.4

Interaction of the components

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Explanation of the transitions during system start
While a state is passed through, different tests are carried out (e.g. it is tested whether the physical

topology complies with the configuration). If the tests are successful, the system automatically

changes to the next state.

If the tests are not successful, the fieldbus changes to the next state. Corresponding remedial

measures are described in the chapter "

Error scenarios

"

( 174)

.

State

What happens?

What is tested?

PLC

EtherCAT

Origin

Unknown

The system starts.

EtherCAT configuration available?

Origin

Init

EtherCAT is initialised (a fieldbus

scan is carried out).

Does the EtherCAT configuration

match the results of the fieldbus

scan?

Stop

Pre-operational

• EtherCAT is active.

• SDO communication is possible.

Running

Safe-operational

• The PLC program is being loaded.

• The PLC is running.

• The input data in the process

image are updated.

• The output data from the process

image are not transferred to the

slaves.

Running

Operational

The system is running.

Advertising