7commissioning of the system – Lenze EtherCAT Controller-based Automation User Manual

Page 86

Advertising
background image

7

Commissioning of the system

7.3

Detailed description of the commissioning steps

86

Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5. Open the EtherCAT I/O image tab of the EtherCAT master and select the bus cycle task for

the master (Lenze Controller).

The "Cycle settings of the higher-level bus" serve to use the bus cycle task set via the PLC

settings tab of the Lenze Controller (device):

Advertising