11 creating a task, Creating a task ( 82), 7commissioning of the system – Lenze EtherCAT Controller-based Automation User Manual

Page 82

Advertising
background image

7

Commissioning of the system

7.3

Detailed description of the commissioning steps

82

Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

7.3.11

Creating a task

How to create a task in »PLC Designer«

1. Open the context menu of the Task configuration and execute the command Add object in

order to create a new task.
Assign a reasonable task name, e.g. "MotionTask".

2. Enter a reasonable cycle time in milliseconds for the created task in the Interval input field.

Note!

• Select a cycle time, according to the technical data, from 1 ... 10 ms.
• If "distributed clocks" (DC) are used, the task cycle time to be set must comply with the

set DC cycle time.

Setting a DC synchronisation

( 87)

Advertising