JLG X23J - X700AJ Service Manual User Manual

Page 391

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-364

– JLG Lift –

3121448

INSTALLATION PROCEDURE

3. Ensure that all components are clean and free from

damage. Replace any components that are worn or
damaged.

4. Position pulley (4) and spacer (3) on water pump

(5). Ensure that the bolt holes are aligned.

5. Install fan (2).

NOTE: Ensure the correct orientation of the fan.

6. Install bolts (1) and tighten to a torque of 11 N·m (97

lb in).

End By:

a. Install the V-Belt. Refer to Disassembly and

Assembly, “V-Belts - Remove and Install”.

ALTERNATOR - REMOVE AND INSTALL (14 AMP AND
15 AMP ALTERNATORS)

REMOVAL PROCEDURE

Start By:

a. Remove the V-Belt. Refer to Disassembly and

Assembly, “V-Belts - Remove and Install”.

KEEP ALL PARTS CLEAN FROM CONTAMINANTS. CONTAMI-
NANTS MAY CAUSE RAPID WEAR AND SHORTENED COMPONENT
LIFE.

1. Turn the battery disconnect switch to the OFF posi-

tion.

2. Make temporary identification marks on the connec-

tions of the harness assembly.

3. Disconnect the harness assembly (not shown) from

alternator (6).

4. Remove bolt (1), washer (3) and nut (4) from alterna-

tor (6).

5. Remove bolt (7) and remove alternator (6) from the

engine.

6. If necessary, remove bolts (5) and remove adjusting

link (2).

NOTE: The adjusting link on some engines is secured by

one bolt.

Advertising