5 pressure setting procedure, Control valve left side (chassis functions), Control valve right side (chassis functions) – JLG X23J - X700AJ Service Manual User Manual

Page 462

Advertising
background image

SECTION 5 - HYDRAULICS

5-36

– JLG Lift –

3121448

5.5 PRESSURE SETTING PROCEDURE

Cold temperatures have a significant impact on pressure
readings. JLG Industries Inc. recommends operating the
machine until the hydraulic system has warmed to normal
operating temperatures prior to checking pressures. JLG
Industries Inc. also recommends the use of a calibrated
gauge. Pressure readings are acceptable if they are within
± 5% of specified pressures.

Control Valve Left Side (Chassis functions)

1. Machine completely closed.

Figure 5-104.

2. Install the pressure gauge at the port marked MA

Figure xx.

3. Activate the function outrigger IN on remote control.

4. Verify that the pressure is as on Table below.

To adjust the relief valve, turn clockwise to increase, turn
counterclockwise to decrease the pressure.

Control Valve Right Side (Chassis
functions)

1. Install the pressure gauge at the port marked MB

Figure xx.

2. Activate the function outrigger IN on remote control.

3. Verify that the pressure is as on Table below.

To adjust the relief valve, turn clockwise to increase, turn
counterclockwise to decrease the pressure.

Control Valve Left Side (Chassis functions)

Model Pressure

Port

Function

Outrigger IN

Pressure setting

Outrigger N°

Bar

PSI

X23J

X700AJ

MA

3; 4

160

2320

X17J

1; 2

165

2400

X14JH

Stab. SX

175

2540

X19J

X550AJ

3; 4

165

2400

X14J

X390AJ

4; 2

0,2

A

3,23,2

B B

B B

APPOGGIO_POST

Control Valve Right Side (Chassis Functions)

Model Pressure

Port

Function

Outrigger IN

Pressure setting

Outrigger N°

Bar

PSI

X23J-

X700AJ

MB

1; 2

160

2320

X17J

3; 4

165

2400

X14JH

Stab. DX

175

2540

X19J-

X550AJ

1;2

165

2400

X14J-

X390AJ

1; 3

Advertising