Installation information – JLG X23J - X700AJ Service Manual User Manual

Page 84

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121448

– JLG Lift –

3-57

INSTALLATION INFORMATION

INSTALLATION PROCEDURE

Before proceeding with installation, follow the instructions
given below.

• Properly clean the product by removing packaging

and all remains of protection padding.

• Prepare the parts to be coupled using the installation

drawing as a guide.

The main installation processes are given below. In the fol-
lowing sections, the procedures to follow are given in
detail.

– Installation of the track drive on the machine.

– Sprocket fixing to the track drive.

– Connecting the hydraulic system.

– Filling-up the gearmotor with lubricating oil and
level of oil to maintain in the gearbox.

When assembling the track drive on the machine and con-
necting the hoses, follow instructions shown in below
sketch for proper direction of rotation.

Direction of rotation

Oil port inlet

Oil port outlet

Direction of

rotation (view

from motor)

P1

P2

Clockwise

P2

P1

Counterclock-

wise

Figure 3-158.

Advertising