MacDon FD75 OM User Manual

Page 395

Advertising
background image

MAINTENANCE AND SERVICING

6.

Line up tine bar (B) with cam arm and install bolt (A).
Torque bolt to 120 ft·lbf (165 N·m).

Figure 6.273: Cam End

7.

At the center disc, install the bolts (A) securing arm (B)
to disc.

8.

At the tail end, install reel arm (B) and endshield
support (C) from the tail end of the reel at applicable
tine tube location with bolts (A).

NOTE:

There

are

no

endshields

on

the

center disks.

Figure 6.274: Tail End

9.

At the cam end, install endshield support (A) at
applicable tine tube location on the cam end.

10. Re-install endshields.

Figure 6.275: Cam End

169894

381

Revision A

Advertising