Adjusting ground pressure (gleaner r65/r75) – MacDon FD75 OM User Manual

Page 98

Advertising
background image

OPERATION

Adjusting the Header Raise/Lower Rate (Gleaner R65/R75)

NOTE:

Changes may have been made to the combine controls or display since this document was published.
Refer to the combine operator’s manual for updates.

Header height control system stability is affected by
hydraulic flow rates. Ensure that the header raise (A) and
lower (B) adjustable restrictors in the hydraulic valve are
adjusted so it takes approximately six seconds to raise the
header from ground level to maximum height (hydraulic
cylinders fully extended) and approximately six seconds to
lower the header from maximum height to ground level.

NOTE:

Make

this

adjustment

with

the

hydraulic

system at normal operating temperature (130°F
[54.4°C]) and the engine running at full throttle.

Figure 4.91: Header Raise and Lower
Adjustable Restrictors

Adjusting Ground Pressure (Gleaner R65/R75)

NOTE:

Changes may have been made to the combine controls or display since this document was published.
Refer to the combine operator’s manual for updates.

169894

84

Revision A

Advertising