Rockwell Automation 8520 9/Series CNC Lathe User Manual

Page 771

Advertising
background image

Chapter 30

Using a 9/Series Dual--Processing System

30-31

Figure 30.14

Backup Interference Boundary Screen

TO

PORT A

TO

PORT B

TO

FILE

STORE TO BACKUP
INTERFERENCE TABLE

5.

Determine the destination for the G10 program:

To Send the G10 Program To:

Press This Softkey:

Go to Step:

peripheral attached to port A

{TO PORT A}

7.

a peripheral attached to port B

{TO PORT B}

7.

to control memory

{TO FILE}

6.

6.

Press the

{TO FILE}

softkey. The control asks for a program name.

By using the alphanumeric keys on the operator panel, enter the

program name you wish to call the backup program . Press the

[TRANSMIT]

key once you have entered the program name. See

chapter 10 on program names. The G10 program is saved under the

file name just entered.

7.

Press the

{TO PORT A}

or

{TO PORT B}

softkey. A

{YES}

or

{NO}

softkey is displayed. Press

{YES}

to confirm or

{NO}

to abort. If you

confirm the operation, the G10 program is written to a peripheral

attached tot he selected port.

Advertising