Hypertherm Powermax125 Service Manua User Manual
Page 237
Advertising

Powermax125 Service Manual 808070
237
9 – Power Supply Component Replacement
5. Push the threaded end of the new work lead receptacle into the opening in the front panel, with the keyway facing up,
until fully seated. (See
6. Place the lock washer over the work lead receptacle inside the power supply.
7. Tighten the nut onto the work lead receptacle.
8. Secure the work cable to the work lead receptacle by tightening the bolt.
Figure 94
9. Complete the following procedures:
a. See Install the fan shroud on page 216.
b. See Install the power supply cover on page 172.
c. Reconnect the power and gas supply.
Front panel
Work lead receptacle
Keyway up
Advertising
This manual is related to the following products: