Operating the powermax – Hypertherm Powermax125 Service Manua User Manual

Page 44

Advertising
background image

44

Powermax125 Service Manual 808070

3 – Basic System Operations

Operating the Powermax

Follow the steps below to begin cutting or gouging with the system.

This section provides basic operating instructions. Before operating your system in a
production environment, refer to

Hand Torch Setup on page 51 or Machine Torch Setup

on page 67.

Connect the electrical power, gas supply, and torch lead

For information on connecting the proper plug to the power cord, refer to

Power Supply Setup on page 29.

Plug in the power cord and connect the gas supply line. For more information about the electrical requirements and the
gas supply requirements of the Powermax, see

Power Supply Setup on page 29. To connect the torch, push the

FastConnect connector into the receptacle on the front of the power supply. You will attach the work lead in the next step.

CCC units do not ship with a power cord. To maintain CE certification, install power cord
kit 228886.

Torch lead

Work lead

Power cord (does not

ship with plug)

Gas supply line

Advertising
This manual is related to the following products: