Functional test report – Basler Electric BE1-11t User Manual

Page 446

Advertising
background image

434

9424200995 Rev H

Step 5: Apply voltage to IN1. Verify that OUT1 closes and remains closed.

Step 6: Power down the BE1-11t and verify that OUT1 opens. Wait 10 seconds and power up the

BE1-11t. Verify that OUT1 closes. This verifies that the 86-1 position is stored in non-volatile
memory. Remove voltage from IN1.

Step 7: Connect power supply to IN2 terminals.

Step 8: Apply voltage to IN2. Verify that OUT1 opens and remains open.

Step 9: Apply voltage to both IN1 and IN2. OUT1 should close. This verifies that the Set input has

priority over the Reset input.

Step 10: Repeat steps 1 through 9 for the 86-2 element.

Step 11: Repeat steps 1 through 10 for settings group 1, 2, and 3.

Functional Test Report

Pass/Fail

P / F

Lockout Functions (86) Test

BE1-11t

Advertising