F-5-2-1 fdt project, F-69, Maximum specification – Yokogawa FieldMate User Manual

Page 188

Advertising
background image

<F Advance>

F-69

IM 01R01A01-01E

9th Edition : May 31, 2013-00

(The communication path that was created above when assigning the device is a FDT

Project name).

7. Select the device, start up DTM Works, and set and adjust the device.

*

:

When you add or delete a Comm DTM, Gateway DTM, or Device DTM, you need to update the DTM catalog in order to refresh

it.

F-5-2-1 FDT Project

An FDT Project is composed of a network topology of Comm DTM, Gateway DTM, and Device

DTM defined in DTM Works, and DTM data set for each DTM. The following shows the overview

of the FDT Project.

F050202E.ai

FDT Project - A

DTM topology data

commDTM-1

gwDTM-1

devDTM-2

commDTM-2

gwDTM-2

devDTM-3

devDTM-4

devDTM-1

Shows a single FDT Project. The

data can be saved, exported,

imported, and deleted.

FDT Topology

Assigns the Comm DTM, Gateway DTM, and Device DTM to

create a network topology (device configuration). Multiple Comm

DTMs, Gateway DTMs, and Device DTMs can be assigned.

The information in the network

topology is stored as DTM

topology data.

Stores the

configuration data of

each DTM.

Figure F-5-10

Overview of FDT Project

Maximum Specification

Maximum number of FDT Projects: 30
Maximum number of DTM definitions in a single FDT Project (*): 100

*

:

A total number of Device, Comm, and Gateway DTMs

Maximum number of startups of DTM Works: 5

Advertising