F-8 relation between main window and dtm works, F-8-1 startup – Yokogawa FieldMate User Manual

Page 219

Advertising
background image

<F Advance>

F-100

IM 01R01A01-01E

9th Edition : May 31, 2013-00

F-8 Relation between Main Window and

DTM Works

This chapter describes the details of the relation between DTM Works and the main

windows - Segment Viewer, Device Navigator, and History.

F-8-1 Startup

The following shows the main ways to start up DTM Works.

• Select the connected device in the BIC mode of Segment Viewer and start up DTM

Works.

• Select the database device in Device Navigator and start up DTM Works.
• Select the DTM data in Device Navigation Info and start up DTM Works.
• Use New FDT Project in the UDC mode of Segment Viewer to start up DTM Works.
• Use Open FDT Project in the UDC mode of Segment Viewer to start up DTM Works.
• Select a connected device in UDC mode of Segment Viewer and start up DTM Works.

Advertising