Toshiba HWS-802XWHT6-E User Manual

Page 110

Advertising
background image

109

Toshiba

3. Trial Operation

<Procedure>
A trial operation is available with an actual operation in progress or stopped. A trial operation is available in any of
the hot water supply, heating, or cooling mode. The compressor starts according to the trial operation frequency.
A trial operation automatically stops after 30 minutes at the longest if not stopped with the remote controller.

1

Press the remote controller TEST

button for 4 seconds or

longer to display "TEST" on the LCD screen.

<For hot water supply trial operation>

2

Press the HOT WATER

button, and a hot water supply

operation starts after 3 minutes. (See display

)

(The pump immediately starts.)

3

Pressing the HOT WATER

button again stops the hot

water supply operation.

<For heating trial operation>

1

Press the ZONE1,2

button, and a heating operation

starts after 3 minutes. (See display

)

(The pump immediately starts.)

2

Pressing the ZONE1,2

button again stops the heating

operation.

<For cooling trial operation>

2

Press the ZONE1,2

button and then OPERATE MODE

, and a cooling operation starts after 3 minutes.

(The pump immediately starts.)

(See display

)

3

Pressing the ZONE1,2

button again stops the cooling

operation.

4

Press TEST

on the remote controller to exit the trial

operation mode.

1, 4

2, 3

1, 4 2, 3

1, 4 3

2

+00A09-002_01EN_SVM_ALL_Air_to_Water.book Page 109 Monday, October 5, 2009 2:09 PM

Advertising