Toshiba HWS-802XWHT6-E User Manual

Page 43

Advertising
background image

42

Toshiba

8-2.

Operation
Mode and
Control Method

5) Simultaneous operations of "hot water supply" and "cooling"
For simultaneous operations of "hot water supply" and "cooling", basically cooling runs by a heat pump operation, and
hot water supply by a heater operation.

* Note that after a "cooling" heat pump operation is selected, if the thermostat off status continues for 10 minutes and

TTW < 38°C is met, the operation switches to a hot water supply operation.

When TTW 45°C (FC: changeable) is met, the operation returns to the normal mode.

6) Boiler-assisted heating operation
This operation is enabled when DPSW13_2 is ON (A boiler exists).

• I zone Heat pump operation

A heat pump operation is usually performed.

• J zone Heat pump operation + Boiler operation *1

A heat pump + boiler operations (*2) are performed, and a heater operation is performed in the Hot water supply side.

*1: In J zone, the hydro unit setting has a priority, and when the set temperature is reached, the boiler output also becomes

OFF.
Setting FC_3E to "1" makes the boiler has a priority, and even if the hydro unit set temperature is reached, the boiler
output remains "ON".

*2: The boiler operation only gives boiler instruction from the hydro unit through the option board.

Related FC

Item

Operation flow and applicable data, etc.

Hot water supply side

Cooling side

Normal

Heater *

Heat pump *

Hot water supply side

Cooling side

Cooling

thermostat off

10 min. passed

Heat pump

Stop

E

I zone

J zone

Heat pump

operation

Heat pump

boiler operation

TO

FC No.

Setting item

Default

Setting available range

23

Heat pump only / Simultaneous operation switching TO
temperature (E)

-10

-20-20°C

3E

Hydro unit setting / Boiler set temperature priority switching

0: Priority on

hydro unit
setting

1: Priority on boiler setting