Toshiba HWS-802XWHT6-E User Manual

Page 81

Advertising
background image

80

Toshiba

[A08] Error Lo pressure sensor lowering operation failure (Cooling/Defrosting operation)

Replace flow switch

Remove waste

Flow switch is normal

Secure water
circulation amount

Circulation flow
shortage

Waste stuck inside
water circuit

12 M or longer water
pipe to a branch,
or 5 or less branches

Remove sufficiently
excess air

Place buffer tank and
the second pump

No

Excess air

noise comes from

inside pump

Chattering

noise comes from

flow switch

Start

No

No

Yes

Raise set temperature

Yes

(Cooling overload operation)

Continued

operation at low outside

temperature and at 15°C or lower

set temperature

No

Defrost outdoor unit
where frost remains

Yes

Defrosting

takes 15 mins or longer

(Frost remains)

No

Replace lo pressure sensor

No

Lo pressure sensor

is normal

Yes

Yes

Yes

Replace water heat

exchange control board

+00A09-002_01EN_SVM_ALL_Air_to_Water.book Page 80 Monday, October 5, 2009 2:09 PM

Advertising