Spectra Precision ProMark 800 Reference Manual User Manual

Page 84

Advertising
background image

72

Precise Surveying - Field Applications & Concepts

3. Enter the latitude, longitude and ellipsoidal height of the

first reference point.

4. Set horizontal or/and vertical control for the first reference

point. This means requiring that the local grid pass
through respectively the horizontal or/and vertical position
of the point.

5. Resume the previous three steps until all the reference

points have been defined.

6. Run the localization process and make sure the local grid

is now the new projection system used in the job.

Advertising