0 3, 5, and 12 leads test, M series service manual – ZOLL M Series Defibrillator Rev R User Manual

Page 20

Advertising
background image

M Series Service Manual

10

3.0 3, 5, and 12 Leads Test

Tools Needed:

3 lead, 5 lead, and 12 lead cables. Test each cable separately. QED 6 Defibrillator Analyzer.

Test Setup:

The M Series unit must be configured to display ECG LEAD OFF message.

Connect the lead wires appropriate to each test to the QED 6 Defibrillator Analyzer.

Do this...

Observe this...

Pass/Fail/
NA

3.1

Turn the selector switch to
MONITOR. Select leads.

The monitor displays the NO ECG LEADS OFF
message.

o

o

o

3.2

Disconnect one lead from the
simulator.

The monitor displays the ECG LEAD OFF message
within 3 seconds (if configured).

o

o

o

3.3

Reconnect the lead. Repeat
step 3.2 with the remaining
leads.

The ECG LEAD OFF message appears when the
lead is disconnected and clears the lead is
reconnected.

o

o

o

3.4

Repeat 3.2 and 3.3 for 5 lead
and 12 lead cables.

Note:

If heart rate alarm sounds, press and hold the
ALARM SUSPEND button for 4 seconds to
disable the alarms.

Note:

When testing the 12 lead cable, the ECG
LEAD OFF
message displays when you pull
off a limb lead. When you pull off a V lead, the
ECG VX LEAD OFF message displays, where
“X” is the number between 1 and 6.

o

o

o

Record your results on the Maintenance Tests Checklist.

Advertising