SECTION 2 - OPERATION

2-73

5. Remove the retainer and seal, 1, using a slide

puller, 3, with a fabricated end, 2. Install a bolt

through the PTO cover and fabricated puller.

NOTE: The fabricated end, 2, consists of a nut that

fits the puller, 3, with a second nut welded to the first

nut.

6. Pull the shaft and bearing assembly.

106

7. Remove the snap ring, 1, and bearing, 2, from the

shaft, 3.

8. Switch the shaft and reassemble in the reverse

order.

9. Apply a bead of gasket eliminator to the shaft

retainer and reinstall it. Torque the four retaining

bolts to 108 N·m (80 ft.-lbs.).

10. Remove the two long M20 x 120 bolts. Add

thread sealer to the original M20 x 60 bolts and

torque them to 641 N·m (475 ft.-lbs.).