Buhler 2180 User Manual

Page 150

Advertising
background image

SECTION 2 - OPERATION

2-104

LINKAGE CATEGORY CONVERSION

Tractors are equipped with Category III linkage.

To convert from Category III to Category II, bushings

may be inserted into the top link and lower link

implement connections. The guide blocks and

spacers must be repositioned, as previously

described.

QUICK HITCH

The quick hitch allows fast, easy hitching and

unhitching of implements. The hitch fits implements

with ASAE category III hitches. Do not use the hitch

with implements which have offset cross-shafts such

as may be found on mounted moldboard plows with

in-furrow hitches.

Installation and Removal
1. Place the quick hitch, 1, at rear of the tractor and

install on the lower links using the lower link pins,

2, and retaining bolts.
Torque the retaining bolts to 115 N·m (85 ft.-lbs.).

2. Tilt the hitch upright and secure the upper link

with the top link pin, 3, and retaining bolt.
Torque the bolt to 115 N·m (85 ft.-lbs.).

3. Reverse the procedure to remove the quick hitch.

Hitching
1. Position the latch handles, 4, down as shown.

The latch handles must be down for the hitch to

latch.

2. Back the tractor to the implement making sure

that the lower hooks are below the implement

pins.

3. Raise the quick hitch until the pins engage the

hooks.

WARNING

Be certain that both latches fully engage the

implement hitch pins before transporting or

operating the implement.

4. Perform all checks listed under the “Attaching

3-Point Equipment” heading.

5. To unhitch equipment, position the equipment so

that it will not fall when unhitched and pull the

latch handles, 4, up to open the lift pin latches.

Lower the quick hitch until it disengages from the

implement. Remove any control connections

and slowly drive the tractor away.

2

4

3

2

1

158

Advertising
This manual is related to the following products: