SECTION 3 - LUBRICATION AND MAINTENANCE

3-56

EVERY 2400 HOURS OR 24 MONTHS (WHICHEVER OCCURS FIRST)

4. Remove the injector retaining bolts and washers,

1, and hold-down clamp, 2.

5. Turn the injector, 3, clockwise to loosen it, then

remove from the head.

6. Remove the copper sealing washer, 4, from the

injector. If the washer is not on the injector it has

remained in the head and must be extracted.

Discard the copper washers.

7. Remove the cork dust seal, 5, from the injector.
8. Install a new cork dust seal on the replacement

injector.

9. Install a new copper washer on the end of the

injector.

10. Install the injector.
11. Install the hold-down clamp.
12. Install the retaining bolts and washers. Torque

the bolts evenly to 22 N·m (17 ft.-lbs.).

13. Install the leak off line using new copper

washers, 6, on either side of the banjo fitting.

14. Torque the leak off line retaining bolt, 7, to 4.5

N·m (40 in.-lbs.).

15. Install the high pressure line and tighten the

connector to 24 N·m (18 ft.-lbs.).

16. Repeat the process on the remaining injectors.
17. Bleed the fuel system as detailed in “Operation

66” in this section.

18. Start the engine and visually inspect for leaks.
The injectors which were removed should be

serviced by an authorized dealer and retained for use

at the next service interval.

NOTE: Unauthorized modification or adjustment of

fuel injection equipment outside specification will

invalidate the warranty.

NOTE: Be sure to install the clamp with the raised

side facing up.

97