Buhler 2180 User Manual

Page 145

Advertising
background image

SECTION 2 - OPERATION

2-99

3-POINT HITCH LINKAGE

INTRODUCTION

The tractor will accept category II, III, and III N

implements that conform to SAE-ASAE standard

dimensions.

The 3-point hitch linkage consists of the following

components:

1. Left lift rod
2. Top link
3. Top link transport hanger
4. Right lift rod
5. Right lift rod adjusting block
6. Right lower link
7. Sway blocks
8. Left lower link
9. Left lift rod adjusting block

NOTE: Before attaching equipment read this section

carefully.

When attaching mounted equipment to the three-

point linkage, the following adjustments may be

made to ensure satisfactory operation:

1

2

3

4

5

6

7

8

9

145

LIFT RODS

WARNING

Before disconnecting a lift rod from the lower

link, lower attached equipment to the ground and

make sure the hydraulic control lever is fully

down. Stop the engine. Make sure attached

equipment is correctly supported before remov-

ing the lift rod securing pin.

To adjust either lift rod, 1, raise the adjusting block,

2, and rotate it to lengthen or shorten the lift rod

assembly. To prevent rotation of the adjusting block,

slip it down to engage on the locking boss, 3, on the

lift rod end. For most implements adjust both lift rods

so the centers of the lower link balls are 254 mm (10″)

above the ground when the hitch is fully lowered.

Adjust the lift rods to level the equipment in the

operating position.

146

Advertising
This manual is related to the following products: