SECTION 3 - LUBRICATION AND MAINTENANCE

3-64

3. Put RAISE/WORK switch, 1, in work position, 3.

(2 = Raise position, 3 = Work position, 4 = lower

position)

4. Start the tractor with the parking brake applied.
5. Move the quadrant lever fully forward.
6. Check lift cylinders for exposed chrome. If

chrome is visible, use fender switches to lower

3-point until cylinders are fully retracted.

NOTE: The RAISE/WORK switch must be cycled to

the raise position then work position before the

quadrant lever will capture the hitch and allow you to

proceed.

7. Slowly move quadrant lever rearward to full up

position, which captures the hitch and raises it to

the top of its range.

NOTE: Steps 1-7 allow the modules to establish the

limits of the rockshaft and quadrant sensors, (0-99).

3

2

4

109

EDC Valve Calibration
1. To calibrate the 3-point hitch valve select mode

11 by:
a. holding the set up select switch, 1,

(approximately 3 seconds) until a “beep” is

head from the alarm. The TPM display will

indicate --- 1, 2, which means the EIC is at

mode 1.

110

b. using the “DIGIT SET” switch, 1, (up arrow)

advance to mode 11.

c. enter mode 11 by holding the SET/UP

SELECT switch, 2, (approximately 3 sec-

onds) until a “beep” is heard.

1

2

111

Advertising