Buhler 2180 User Manual

Page 216

Advertising
background image

SECTION 3 - LUBRICATION AND MAINTENANCE

3-28

EVERY 50 HOURS

OPERATION 29

LUBRICATE 3-POINT HITCH LINKAGE

(3 fittings on each vertical link and 2 fittings on

the top link)

Lubricate by supplying grease through the fittings.

NOTE: Lubricate at 10-hour intervals when

operating in extremely wet, muddy or very dusty

conditions.

Grease Specification: Use lithium base EP

high temperature grease available from your

Buhler Versatile dealer.

49

OPERATION 30

LUBRICATE ROLLER DRAWBAR

(IF EQUIPPED)

Lubricate by supplying grease through the fittings.

NOTE: Lubricate at 10-hour intervals when

operating in extremely wet, muddy or very dusty

conditions.

Grease Specification: Use lithium base EP

high temperature grease available from your

Buhler Versatile dealer.

50

Advertising
This manual is related to the following products: