1 commissioning steps (overview), Commissioning steps (overview), Commissioning – Lenze ECSCExxx Power supply module User Manual

Page 61

Advertising
background image

Commissioning

Commissioning steps (overview)

6

l

61

EDBCSXE040 EN 7.0

6.1

Commissioning steps (overview)

Start

Make basic

settings

(

^ 62)

Operation via system bus (CAN) with

higher−level master

(

^ 64)

Control via digital inputs

(

^ 65)

Configure system bus (CAN)

Digital inputs

Set X6/DI1, DI2 = HIGH

Digital inputs

Set X6/DI1, DI2 = HIGH

Specify control word

Specify control word

Configure monitoring

functions

(

^ 101)

l

Save parameters in the power supply
module with C0003 = 1.

l

Save parameter set with GDC in the
parameter set file.

Switch on the mains

End

Advertising
This manual is related to the following products: