Commissioning

After mains switch−on

6

l

72

EDBCSXE040 EN 7.0

6.6

After mains switch−on

The mains voltage detection will be enabled when the low−voltage supply is switched on.

The following data are continuously recorded:

ƒ

Mains voltage amplitude

ƒ

Mains phase sequence

ƒ

Mains frequency

ƒ

Balance of the mains