6 after mains switch-on, After mains switch−on, Commissioning – Lenze ECSCExxx Power supply module User Manual
Page 72
Advertising
![background image](/manuals/566199/72/background.png)
Commissioning
After mains switch−on
l
72
EDBCSXE040 EN 7.0
6.6
After mains switch−on
The mains voltage detection will be enabled when the low−voltage supply is switched on.
The following data are continuously recorded:
ƒ
Mains voltage amplitude
ƒ
Mains phase sequence
ƒ
Mains frequency
ƒ
Balance of the mains