Physical installation 1 - 15 – Yaskawa E7L Drive Bypass User Manual

Page 27

Advertising
background image

Physical Installation 1 - 15

DIP Switches are “ON” when moved toward the enclosure door.

Fig 1.10 DIP Switches S1 to S4 for Drive/Bypass Operational Configuration

DIP Switch S1 example

2

3

4

1

Advertising